Data centers

Firm your first phase with capacity your utility can count.

We contract metered flexibility from water and industrial plants on your utility, so new load can connect while the grid catches up.

We firm your first phase, typically tens of megawatts, where the limit is supply rather than wires. Your campus keeps running at full output while the plants around it step aside. If a plant underperforms, portfolio reserve covers it first, and your contract sets the rest.

How it counts
Year0.0
Illustrative 200 MW campus with a 40 MW first tranche from plants. Depends on your utility accepting the capacity; timelines vary by utility and site.
How it counts

Capacity your utility can count on, from plants on your grid.

We build each deal around your utility's rules. Some new large-load tariffs let customers bring approved alternatives that add capacity, instead of interrupting their own load. Where your utility's rules don't allow it yet, we tell you up front. You sign one contract with Argo, covering every plant behind your capacity. Flexibility frees capacity, not wires: it helps where the limit is supply at peak, not where your site needs a new substation. Your Brief says which applies.

01 · Same grid

Matched to your utility and zone

We only pair your site with plants on the same utility and behind the same grid constraints, so the megawatts land where you need them.

02 · Real channels

Through programs that exist

Utility capacity contracts, large-load tariff provisions and interruptible service, where your utility allows them.

03 · Firm

Firm means it counts

Firm means accredited under your utility's or market's rules. Every plant is modeled hour by hour and metered against an agreed baseline. Commitments carry reserve across many plants. Any shortfall is measured, reported and made right under your contract.

Your options

The fastest megawatt is already built.

How plant flexibility compares with the other ways to firm a new campus.

Plant flexibilityOn-site gasBatteriesThrottle your own load
Path to firm powerContract in months, then utility acceptanceYears, with turbine backlogsOne to two years, then interconnectionMonths, needs a utility agreement
Utility approval neededYesYesSometimesYes
Your computeFull outputFull outputFull outputCurtailed in events
Permits at your siteNoneAir permitSpace and fire codeNone
Capital you carryNone upfront; capacity paymentsHighHighNone, but lost revenue
Typical scaleTens of MW per site, growingHundreds of MWTens to hundreds of MWYour flexible share
Best used asFirst tranche while the grid buildsLong-term supplyPeak shaving, backupPairs with plant flexibility
Speed-to-Power Brief

A plan for your site, in about a week.

01

Your gap. When you need firm power versus when your utility plans to deliver it, from public planning documents.

02

Flexible supply near you. How much water, wastewater and industrial flexibility sits on your utility and grid zone, as a range, and how much accredits.

03

The path. Which contract route fits your market, and what your utility will need to see.

04

A walkthrough on a call. How the path would work for your site and what it would take, before any terms.

05

Timeline to a term sheet. The steps, the owners and the dates.

Start here

Tell us about your site.

Two minutes. Your Speed-to-Power Brief follows in about a week.